The Flextura system has two separate sputtering chambers; Gate 2 has five sputter sources, and Gate 3 is the remote plasma chamber, where the plasma is generated remotely, that has 4 sputter sources. The four systems are all suitable for fabricating metal oxide, and metal nitride thin films, and offer a wide parameter space for optimizing the thin film growth process. For contamination control, the systems are dedicated to specific materials systems.
Sputter sources
- Direct current (DC): Semicore, NanoPVD and Flextura (Gate 2 and 3).
- Radio-frequency (RF): Moorfield, Semicore, NanoPVD and Flextura (Gate 2 and 3).
- High-Power Impulse Magnetron sputtering (HiPIMS): Flextura (Gate 2 and 3).
- Remote-plasma sputtering: Flextura (Gate 3).
Instruments Features
- Substrate size: Samples up to 4 in. wafers are applicable for all systems. Moorfield can handle larger substrates. Smaller samples are also applicable.
- Substrate heating: maximum substrate heating for the different systems are as follows; Moorfield (600 oC), Semicore (600 oC), NanoPVD (600 oC) and Flextura (1000 oC).
- Inert and reactive gasses: The availability of gasses for sputtering in the systems are as follows: Moorfield (Ar, N2 and O2), Semicore (Ar, N2 and O2), NanoPVD (Ar, N2 and O2) and Flextura (Ar, N2, H2 and O2).
- Number of sources and possibility of co-sputtering:
- Moorfield: two 3 in. RF sources, co-sputtering possible.
- NanoPVD: two 2 in. RF sources and one 2 in. DC source, co-sputtering possible with either two RF sources or one RF and DC source.
- Semicore: two 3 in. RF sources and one 3 in. DC source, co-sputtering possible.
- Flextura Gate 2: one 3 in. HiPIMS source, two 3 in. RF source, and two 3 in. DC sources. Co-sputtering possible.
- Flextura Gate 3: one 3 in. and 2 in. RF sources, and one 3 in. and 2 in. DC sources. Co-sputtering possible.
-
Typical base pressure:
- Moorfield: < 3 x 10-6 mbar after 5h pump-down, 3 x 10-7 mbar after 24h.
- Semicore: < 3 x 10-6 mbar after 5h pump-down, 3 x 10-7 mbar after 24h.
- NanoPVD: < 3 x 10-6 mbar after 3h pump-down, 3 x 10-7 mbar after 24h.
- Flextura Gate 2 and 3: The system has a load-lock which pumps down in ~15min. Gate 2 and 3 are thus not ventilated and remains at a base pressure in the range of 10-8 - 10-9 mbar.
-
Materials systems:
- Moorfield: Wide range of materials allowed, including metal oxides, metal nitrides and metal films.
- NanoPVD: Wide range of materials allowed, including metal oxides, metal nitrides and metal films.
- Semicore: Wide range of materials allowed, mostly used for metal oxides, as ZnO, CuO2, SnO.
- Flextura Gate 2: Metal oxynitrides and metal nitrides, mostly used for ZnON and II-IV nitrides.
- Flextura Gate 3: Metal oxides, mostly used for Ga2O3 growth.
- For new materials, please contact UiO MiNaLab Manager for further discussion.
- Extended Flextura capabilities:
- In-situ annealing in anion- or cation-rich ambient. Anion-rich ambient employing gas (Ar, N2, O2 and H2), cation-rich ambient by employing a 2 in. RF magnetron sputtering source with metal target (not directed at the samples).
- In-situ surface analysis with low-energy electron diffraction (LEED), X-ray and UV- photoelectron spectroscopy (XPS and UPS), and angular-resolved photo-emission spectroscopy (ARPES).
Sample Preparation Equipment
- Roffin laser cutter, for substrate cutting.
- Ångström, Leybold and Baltzers PVD systems, for electrical contact deposition.
Prices
The Semicore, NanoPVD and Moorfield systems are available for rent with or without an operator.
| User Category | Price without operator/hour | Price with operator/hour |
|---|---|---|
| Academia | 500 NOK | 1250 NOK |
| Start-up | 625 NOK | 1725 NOK |
| Industry | 750 NOK | 1850 NOK |
For the Flextura system, the corresponding charges are as follows.
| User Category | Price without operator/hour | Price with operator/hour |
|---|---|---|
| Academia | 800 NOK | 1550 NOK |
| Start-up | 1000 NOK | 2100 NOK |
| Industry | 1200 NOK | 2300 NOK |
Prices are in Norwegian kroner (NOK) excl. VAT. All prices are subject to change. The reduced fees for start-up companies are available for the first 24 months after start-up. Training costs are currently covered by NorFab.
Contact
- Simon Phillip Cooil, Lab Manager
- Eirini Zacharaki, Research Infrastructure Coordinator